top of page
HorseShoe
Horseshoe Design Build, Dallas District:
Preliminary design of bridges for IH-30 segment for bid proposal. Optimized and coordinated bridge design to save cost and decrease construction duration for contractors. Worked with TxDOT, Bridge Design Team, and Pegasus Link Contractors to perform QA/QC review on bridge structures during design stage.
bottom of page