The project involves 4700' of TRE 2nd railroad track construction from bridge 612.00 to Junkins railroad crossing. The construction project involves four steel/box beam bridges, the Trinity River rehabilitation of existing steel truss bridge, installation of No. 11, 15, and 20 turnouts, tracks, signal houses and systems with PTC coordination, two (2) retaining walls T-wall system and public involvements with local neighborhood organizations.