top of page
TRG bridge.jpg

TRE - Trinity River Project

Trinity River Project, Dallas District:

The project involves 4700' of TRE 2nd railroad track construction from bridge 612.00 to Junkins railroad crossing. The construction project involves four steel/box beam bridges, the Trinity River rehabilitation of existing steel truss bridge, installation of No. 11, 15, and 20 turnouts, tracks, signal houses and systems with PTC coordination, two (2) retaining walls T-wall system and public involvements with local neighborhood organizations.

bottom of page